抹面砂漿在施工后需要馬上保養,保養需要留意施工時的溫度,在依據溫度的狀況確認保養時需要準備的材料,此外也是有無需保養的產品,
濟南抹面砂漿具體保養條件如下所示:
The plastering mortar needs to be maintained immediately after construction. The maintenance needs to pay attention to the temperature during construction. The materials to be prepared for maintenance should be confirmed according to the temperature condition. In addition, there are products that need to be maintained. The specific maintenance conditions of Jinan plastering mortar are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規定:
When the daily average temperature of winter construction is less than 5 ° C, the construction shall be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, certain effective measures shall be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up the water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
2. Before being cooled, the compressive strength of cement-based engineering materials shall not be less than 6MPa.
高溫氣候環境施工施工位置溫度超過37°C,應按高溫氣候延緩施工并滿足以下規定:
If the temperature of the construction site in the high-temperature climate exceeds 37 ° C, the construction shall be delayed according to the high-temperature climate and meet the following requirements:
1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take certain effective measures 24 hours before construction to avoid direct radiation or other radiant heat at the construction site.

2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎和設備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of concrete foundation and equipment base plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過35°C。
3. The injection temperature of slurry shall not exceed 35 ° C.
4.施工后應及時采取補濕保養措施。
4. Moisturizing and maintenance measures shall be taken in time after construction.
免保養條件如下所示:
The maintenance-free conditions are as follows:
施工溫度超過5°小于37°時,基礎施工后無需保養。超過溫度范圍應遵循抹面砂漿施工保養方法實行保養。
When the construction temperature is more than 5 ° and less than 37 °, no maintenance is required after the foundation construction. If the temperature exceeds the range, the plastering mortar construction and maintenance methods shall be followed.
冬天保養需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials to be prepared for winter maintenance: cotton quilt and film are mainly used for heat preservation. Because the temperature is too low in winter, it is necessary to prepare for heat preservation
夏天保養需要準備的材料:薄膜,薄膜主要是為了補濕,預防水分的太早外流造成產品施工內部無法牢固,此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內部反應需要大量水分。
Materials to be prepared for maintenance in summer: film, which is mainly used to supplement moisture, to prevent water from flowing out too early and causing the internal construction of the product to be unstable. In addition, it is necessary to sprinkle water on time, which is also used to supplement moisture, because a large amount of water is required for internal reaction after construction.
For the question of whether the plastering mortar needs to be cured after construction, we will explain it here. If you have any doubts or needs about it, please contact us at any time http://m.netjobs.cc !